Addendum One extends the submittal due date.
As a result of Hurricane Sally, the asphalt paving at the southern end of Barracks Street and within the Port of Pensacola requires replacement. The scope of work, as detailed in the drawings and specifications, includes:
- Demolition and removal of the existing asphalt paving and sand/clay base.
- Demolition and removal of concrete pipe sleeper foundations.
- Construction of a new asphalt roadway.